Proven Results Across Complex Environmental Challenges

From contaminated site remediation to regulatory compliance strategy, our project portfolio spans a broad range of environmental challenges. Each entry reflects a specific client need, a structured approach, and a documented outcome. Browse representative work below to see how we engage across industries and project types.

Site Assessment & Remediation

Phase II ESA and Soil Remediation — Former Fuel Distribution Facility

Petroleum hydrocarbon contamination was identified across a 4-acre parcel slated for commercial redevelopment.

Conducted Phase II environmental site assessment, delineated the contamination plume, and implemented in-situ chemical oxidation.

Site achieved regulatory closure within 14 months, enabling redevelopment to proceed on schedule.

Compliance & Regulatory

NPDES Permit Compliance Program — Regional Manufacturing Campus

The client faced escalating stormwater permit violations and risk of enforcement action across a multi-building campus.

Conducted a full stormwater audit, redesigned BMPs, and developed a site-specific SWPPP.

Zero permit exceedances were recorded in the 18 months following program implementation.

Sustainability Consulting

Greenhouse Gas Inventory and Reduction Roadmap — Distribution Network

The client required a verified Scope 1, 2, and 3 GHG inventory to meet supply chain disclosure requirements.

Collected operational data across 12 facilities, applied GHG Protocol methodology, and identified high-impact reduction opportunities.

Inventory submitted on schedule; client committed to a 30% emissions reduction target by 2030.

Emergency Response

Chemical Spill Emergency Response — Highway Corridor Incident

A hazardous material release on a state highway required immediate containment to protect adjacent wetlands.

Deployed a response team within 2 hours, established a containment perimeter, and coordinated with the state environmental agency.

Wetland corridor protected; site decontaminated and reopened within 48 hours.

Site Assessment & Remediation

Vapor Intrusion Investigation — Mixed-Use Urban Redevelopment Site

Legacy dry-cleaning solvent contamination raised vapor intrusion risk for proposed residential units above a commercial ground floor.

Installed a sub-slab monitoring network, modeled exposure pathways, and designed a mitigation system aligned with state risk-based standards.

Mitigation system approved by regulators; residential permitting advanced without delay.

Sustainability Consulting

Environmental Management System Implementation — Municipal Water Authority

The authority needed an ISO 14001-aligned EMS to meet grant eligibility requirements and improve operational compliance posture.

Facilitated a gap assessment, developed a policy and procedure framework, and led staff training across three operational sites.

EMS implemented within budget; authority achieved conditional ISO 14001 readiness in under 10 months.

Working on a Similar Challenge?